Feedback
The level of development proposed is unnecessary and the plan does not adequately provide for infrastructure. The plan should concentrate on brownfield sites rather than encroaching on the already very limited green belt in South Warrington.
The level of development proposed is unnecessary and the plan does not adequately provide for infrastructure. The plan should concentrate on brownfield sites rather than encroaching on the already very limited green belt in South Warrington.