Respondent name
Ross Harding (Cheshire Wildlife Trust)
Responses
Respondent Type
Group/organisation
Policy Name/Part of plan
Whole Plan
Oral Examination
No
Modification if applicable

Aspects of the WLP policies require strengthening to reflect the urgency of tackling the climate and ecological emergencies and to ensure the Plan is effective.

Summary of comments

CWT welcomes many of the Plan policies in principle such as those covering biodiversity and green infrastructure. We also welcome the reduction in the scale of Green Belt release compared with the earlier versions of the WLP.

Respondent Type
Group/organisation
Policy Name/Part of plan
Site Allocations
Oral Examination
No
Summary of comments

CWT has significant concerns with the potential in-combination effects of the scale of development proposed in the Mersey Valley Corridor (a key green infrastructure opportunity area identified in the WLP) and South East Warrington. Warrington Waterfront (MD1), South East Warrington Urban Extension (MD2), Fiddlers Ferry (MD3), the South East Warrington Employment Area (MD6) and the Warrington Western Link (WWL) all have the potential to cause significant in-combination effects to a range of important ecological features throughout and beyond Warrington. Most notably this includes the internationally designated Mersey Estuary SPA and Ramsar site, it?s assemblages of qualifying bird species and the habitats and land that are functionally linked to the main site.

Respondent Type
Group/organisation
Policy Name/Part of plan
Policies Map
Oral Examination
No
Modification if applicable

Depending on national decisions about the future of HS2, it is considered that changes to the Plan (e.g. the route as shown on the Policies Map) will be needed to address this issue.

Summary of comments

CWT has objected to the current proposals for HS2 (phase 2B) due to the disastrous impact that they would have on biodiversity. In our view the alignment and design of HS2 phase 2B will require a complete rethink if it is to comply with national policy and emerging legal duties concerning biodiversity set out in the Environment Bill.

Respondent Type
Group/organisation
Policy Name/Part of plan
Plan as a whole
Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

CWT considers that, despite the various references in the Plan to protecting and improving the natural environment, far stronger emphasis on this issue should be placed throughout the WLP (eg. within the vision and objectives etc. It should be made clearer that a widespread, substantial measurable net gain in biodiversity will be sought across the whole Borough (see our detailed comments).

Summary of comments

Whilst CWT welcome relevant WLP policies in principle, there are places where the Plan wording could be strengthened to better reflect national policy. For example, Policy DC4 and other relevant policies could in our view more simply and precisely require all development to follow the harm avoidance, mitigation and compensation hierarchy set out in national policy (NPPF paragraph 180a). It also needs to be made clearer that, in line with emerging statutory duties, development proposals in all locations will be expected to deliver or contribute to a measurable net gain in biodiversity. These are important issues which should be addressed to make the Plan more effective. In light of the recent significant changes to national nature conservation legislation and policy, CWT recommend that new nature conservation policies in this draft Local Plan take into account the contents of the Environment Act which recently received Royal Assent, or risk being out of date very early in the proposed plan period. As per the NPPF (2021) Paragraph 22; strategic policies should look ahead over a minimum 15 year period from adoption. With the Environment Act having received Royal Assent and with little to no reference to its content around Local Nature Recovery Strategies (LNRS), Nature Recovery Networks (NRN) and strengthened biodiversity duties on local authorities, WLP Policies DC3 and DC4 are unlikely to be fit for purpose for a 15 year period from adoption. CWT strongly recommend new supplementary planning guidance be drafted to help implement BNG measures. The Council will need to identify delivery partners, establish a mechanism to ensure that BNG is fully transparent and accountable and ensure that the Good Practice Principles and British Standards have been adhered to. CWT recently contributed to Cheshire East Council?s draft BNG SPD and would be keen to assist Warrington Council with this as well.

Respondent Type
Group/organisation
Policy Name/Part of plan
Warrington in Context
Oral Examination
No
Modification if applicable

The following should be added at the start of the list of key issues in paragraph 2.2.2: ?Tackling the climate and nature emergencies?. CWT recommend far stronger terminology is used earlier in chapter 2 (e.g. in paragraphs 2.1.42 to 2.1.46 and 2.1.51) to reflect the urgency of addressing these fundamental and intrinsically linked issues. CWT request that the following be added at the start of the list of future opportunities in paragraph 2.2.4: ?Investment in the green economy to tackle the nature and climate emergencies?.

Summary of comments

CWT is extremely disappointed that the list of key issues to be addressed fails to mention the ecological or climate emergencies. These are fundamental challenges affecting Warrington, with the impacts of climate change potentially more significant than elsewhere due to the proximity to the River Mersey. There is significant precedence of these issues being incorporated into the heart of neighbouring Local Policy, including the draft Wirral Local Plan, Greater Manchester?s ?Places for Everyone? and Cheshire West & Chester?s recently published draft Land Action Plan and their exclusion is extremely short-sighted. The list of key opportunities listed in paragraph 2.2.4 fails to include investment in the recovery of nature or investment in the green economy.

Respondent Type
Group/organisation
Policy Name/Part of plan
Vision
Oral Examination
No
Modification if applicable

CWT Proposed modifications: Clause 1 (last bullet) of the vision be changed to ?will be an exemplar green town which will have addressed the climate and ecological emergencies?; Clause 7 of the vision be changed to: ?A substantial and widespread net gain in biodiversity will have been achieved across the whole Borough. As part of this, Warrington?s rich green space network (comprising radial green routes and the circuit of parks and open space encircling the Town Centre and Waterfront) together with its extensive network of waterways will provide a framework for Warrington?s growth and key development areas. Major new parks, new green links, biodiversity areas and increased access to river and waterside frontages (where appropriate) will have been provided improve leisure and active travel opportunities and increase the Borough?s biodiversity.?; Clause 10 of the vision be changed to: ?The Borough will have been carbon neutral since 2030. To achieve this, there will have been a transformation in how Warrington meets its energy needs, with a focus on renewable sources and decentralised networks, benefiting Warrington?s existing and future residents and businesses and helping tackle climate change. New development will be built to the highest levels of energy efficiency and the Town will be at the cutting edge in the use of new green technologies and the implementation of nature based solutions to climate change?. In light of our earlier comments on HS2 and the WLL we recommend references to these infrastructure projects are removed from this section and all subsequent sections of the WLP.

Summary of comments

The text in the vision box itself is lacking in ambition as it fails to reflect the urgency of tackling the climate and ecological emergencies before 2038 or the need to achieve a substantial and widespread net gain in biodiversity.

Paragraph/policy sub

Chapter 3

Respondent Type
Group/organisation
Policy Name/Part of plan
Objectives
Oral Examination
No
Modification if applicable

The Plan objectives should also be strengthened to specifically address the wider social and environmental benefits which arise from enhanced GI and biodiversity.

Summary of comments

There is no objective specifically to protect and enhance existing biodiversity assets and green infrastructure, provide a measurable and widespread biodiversity net gain or implement nature based solutions to climate change. Biodiversity and multi-functional Green Infrastructure (GI) are fundamental place making issues which should govern the location (as well as the design) of new development and also guide public, private and third sector investment.

Respondent Type
Group/organisation
Policy Name/Part of plan
Key Diagram
Oral Examination
No
Modification if applicable

The Key Diagram should be replaced with a plan of similar detail to the Local Plan Policies Map.

Summary of comments

The key diagram lacks key environmental assets and therefore in our opinion downplays their importance in the context of the WLP. For example, it could be changed to include designated sites of nature conservation or the strategic green links referred to in Policy DC3.

Paragraph/policy sub

Page 27

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 3
Sound
No
Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

See detailed comments on the allocation policies.

Modification if applicable

Significant revisions should be made to ensure the allocations are sound and consistent with national policy, particularly at Fiddlers Ferry.

Summary of comments

See detailed comments on the allocation policies. This may result in a reduction in the number of homes delivered across Warrington and therefore this section (and any subsequent sections) referencing the number of homes or areas of commercial/industrial floor space to be delivered should be revised in line with any revisions to specific allocations.

Paragraph/policy sub

Para 3.3.8

Respondent Type
Group/organisation
Policy Name/Part of plan
Spatial Strategy
Sound
No
Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

CWT believe the allocation is unsound and should not be developed at the scale currently proposed as this is not consistent with the recommendations made in national policy.

Modification if applicable

We recommend an alternative strategy for the site is pursued, recognising the site as an important environmental asset that supports the neighbouring international, national and local designated sites for nature conservation.

Summary of comments

The NPPF is explicit that previously developed land, treated as synonymous with brownfield, should be prioritised for development ?except where this would conflict with other policies in this Framework, including causing harm to designated sites of importance for biodiversity? (NPPF Para 119 ? footnote 47). As well as designated sites this clause refers to sites that: Form part of GI or ecological networks; form wildlife corridors and stepping stones; have been identified by national and local partnerships for habitat management, enhancement, restoration or creation; support protected and priority habitats and/or species; when developed will cause significant harm to biodiversity amongst a significant number of other considerations. The development of the Fiddlers Ferry site will cause harm to at least two locally designated sites of importance for biodiversity (Upper Mersey Estuary Local Wildlife Site and the St Helens Canal disused LWS) and may potentially cause harm to the internationally designated sites further downstream (Mersey Estuary SPA and Ramsar).

Paragraph/policy sub

Para 3.3.11

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 3
Oral Examination
No
Paragraph/policy sub

Para 3.3.25 and 3.3.26

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 3
Evidence Base

Brownfield Register

Oral Examination
No
Modification if applicable

CWT would like to see an assessment of the environmental value of sites listed on the Council?s brownfield register, to ensure no sites of high value (or those where development would conflict with other policies in the NPPF, including causing harm to designated sites of importance for biodiversity) are brought forward for development.

Summary of comments

Brownfield sites of high environmental value can deliver alternative multi-functional GI benefits (as per NPPF Para 120b) and therefore an alternative strategy to the development of these sites should be investigated as a matter of priority.

Paragraph/policy sub

Para 3.4.3

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 3
Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

The proposals could potentially give rise to significant adverse ecological affects at an international scale.

Summary of comments

In line with our detailed comments on the Fiddlers Ferry allocation, CWT do not believe that the current proposals will result in a ?major ecological resource?.

Paragraph/policy sub

Para 3.4.10

Respondent Type
Group/organisation
Policy Name/Part of plan
DEV1
Oral Examination
No
Modification if applicable

In line with comments on specific allocation policies, the figures around housing delivery in clause 3 of this policy should be amended. In addition, a specific example in clause 6 of Policy DEV1 should be added in line 6 of paragraph 4.1.23.

Summary of comments

CWT broadly supports the densities sought in Policy DEV1 (clauses 5 and 6), as they will help to achieve an efficient use of land. However, in some cases lower densities are needed to protect and/or achieve a net gain in biodiversity.

Paragraph/policy sub

3

Respondent Type
Group/organisation
Policy Name/Part of plan
DEV4
Oral Examination
No
Modification if applicable

In line with our comments on specific allocation policies, clause 11 of this policy should be amended.

Summary of comments

CWT support the requirement in clause 6 of the Policy that existing allocated sites be protected for employment use as this should reduce the pressure for development elsewhere. However, CWT has concerns about the scale of employment development proposed (which appears to be largely justified on the assumption that past trends will continue) and the implications that this could have for tackling the climate and ecological emergencies.

Paragraph/policy sub

11

Respondent Type
Group/organisation
Policy Name/Part of plan
GB1
Oral Examination
No
Modification if applicable

This clause should be changed to clarify that ?beneficial? use must be for uses ?consistent with? the Plan?s policies on green infrastructure rather than just ?as part of? the Borough?s green infrastructure network.

Summary of comments

CWT supports the statement in clause 2 of this policy that the Council will plan positively to enhance the beneficial use of the Green Belt.

Paragraph/policy sub

2

Respondent Type
Group/organisation
Policy Name/Part of plan
GB1
Oral Examination
No
Modification if applicable

In line with our comments on specific allocation policies clause 3 of this policy should be amended.

Paragraph/policy sub

3

Respondent Type
Group/organisation
Policy Name/Part of plan
GB1
Sound
No
Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

To be fully effective, it needs to be amended to provide clarity.

Modification if applicable

To be fully effective, the clause should be clarified to: ? specify in broad terms what type of environmental improvement will be sought (and that this should include proposals for enhanced biodiversity); and ? Specify in which circumstances developers will need to provide or fund the improvements referred to. Is it intended to apply just to development proposals on sites removed from the Green Belt (as referred to in NPPF para 142) or is it intended to apply more widely?

Summary of comments

CWT supports clause 11 as this seeks to deliver compensatory improvements to the Green Belt. However, to be fully effective, it needs to be amended.

Paragraph/policy sub

11

Respondent Type
Group/organisation
Policy Name/Part of plan
GB1
Oral Examination
No
Summary of comments

In line with comments on the development of brownfield sites that would conflict with policies in the NPPF, including causing harm to designated sites of importance for biodiversity, CWT believe the Council has not correctly considered the requirement to make as much use as possible of suitable brownfield sites and underutilised land (as per NPPF Policy 141).

Paragraph/policy sub

Para 5.1.8

Respondent Type
Group/organisation
Policy Name/Part of plan
TC1
Oral Examination
No
Modification if applicable

CWT would welcome specific reference here to biodiversity and the scope to enhance this through the use of measures such as green roofs, green walls etc. The supporting text (paragraphs 6.1.20 to 6.1.22) should also be strengthened to refer to these.

Summary of comments

CWT supports clause (7b) of the Policy which requires that development proposals in the town centre should enhance the public realm and environmental quality of the area.

Respondent Type
Group/organisation
Policy Name/Part of plan
INF1
Oral Examination
No
Modification if applicable

This clause should be removed.

Summary of comments

In line with our previous comments on HS2, CWT object to clause (3g) of this policy.

Paragraph/policy sub

3g

Respondent Type
Group/organisation
Policy Name/Part of plan
INF2
Oral Examination
No
Modification if applicable

This clause should be removed.

Summary of comments

In line with our previous comments on the Western Link, CWT object to clause (2d) of this policy. The Warrington Western Link (WWL) is likely to contribute to potentially significant standalone or, as discussed in detail later in this response, in-combination effects in the Mersey Valley. CWT strongly object to the development of the WWL as it likely to impact upon the Walton Locks LWS, Moore Nature Reserve LWS and habitats or land that is potentially functionally linked to the Mersey Estuary SPA and Ramsar site.

Paragraph/policy sub

2d

Respondent Type
Group/organisation
Policy Name/Part of plan
INF3
Oral Examination
No
Modification if applicable

This clause should be revised to make it clear that these strategies should form an integral part of the wider master planning of the site, to be considered alongside biodiversity and other issues. This is to ensure that infrastructure planning is designed to complement rather than conflict with biodiversity and other requirements.

Summary of comments

CWT supports the requirement in clause 4 of this Policy for infrastructure to be planned on the basis of site wide infrastructure strategies.

Paragraph/policy sub

4

Respondent Type
Group/organisation
Policy Name/Part of plan
INF5
Oral Examination
No
Modification if applicable

Clause 6 could also specify the need for standardised inputs to be used (NPPF para 58) for matters such as land values to avoid the risk of developers unjustifiably escaping the need for financial contributions to be submitted covering biodiversity enhancement.

Summary of comments

CWT supports the references to biodiversity, open space, green infrastructure and allotments in clause 5. CWT also support the requirement in clause 6 for viability assessments submitted by developers to be ?open book?.

Paragraph/policy sub

5 and 6

Respondent Type
Group/organisation
Policy Name/Part of plan
DC1
Oral Examination
No
Modification if applicable

In clause (2) developers of sites in Inner Warrington should be encouraged to explore ways to enhance biodiversity. The supporting text could explain that this can be achieved by using green walls, green roofs, off site enhancements etc. In clause (7) it could be made clear that developers will be expected to fund enhancements to Warrington?s Circular Parklands as appropriate. In clause (9) it could be made clear that release of Green Belt refers solely to the sites being removed from the Green Belt in this Plan. Biodiversity enhancement should be added to the list of requirements in clauses 12, 15 and 19 (for new development at Victoria Park, Walton Hall and Gulliver?s World respectively) particularly as other matters are listed. The phrase ?have regard to? used in parts of the policy (clauses 13 and 16) is not very clear. CWT would welcome stronger phrasing e.g., ?comply with? which makes it clearer what is expected.

Summary of comments

CWT broadly support the policy subject to some minor amendments. CWT welcome clause 20 and recognise the importance Neighbourhood Planning can have to local
communities.

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

There are several lengthy terms used in the policy to describe similar things (?green infrastructure opportunities?, ?strategic green infrastructure assets?, ?strategic green links? etc.). There should be some simplification of terms to make the policy more easily communicable and hence more effective. In line with our earlier comments around the Environment Act, we recommend additional substantial clauses and supplementary text is included referring to the requirements of the Act in order to ensure Policy DC3 is relevant for the entire plan period or at least for the first 15 years as stated in the NPPF Para 22. Particularly relevant in this section is ensuring there is a strong relationship between the policy wording in the Plan and the forthcoming Local Nature Recovery Strategies. Whilst CWT welcome references to the wetland nature recovery network, this needs to (and will be expected to as a result of the Environment Act) be expanded to other important habitats across Warrington (e.g. woodlands, grasslands, heathlands etc.) as part of the LNRS process. This revision of the WLP needs to ensure the measures and actions within the LNRS are considered appropriately and with significant weight during the planning process.
We would also like to see a clause inserted into the policy wording, and additional supplementary text, around the adoption and implementation of standards for green infrastructure such as the ?Building with Nature? GI accreditation scheme.

Summary of comments

CWT broadly support the policy subject to some amendments. While we welcome the Council?s future consideration of an SPD that will map out the ecological network and set out the Council?s considerations and expectations when such sites are proposed for development, we feel that this Plan should still make reference to these important forthcoming biodiversity strategies.

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

The word ?strategic? should be removed from the heading of clause 1.

Summary of comments

The clause should apply to all green infrastructure, not just strategic GI.

Paragraph/policy sub

1

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Summary of comments

We welcome the inclusion of clause 2(a) (the Mersey Valley) in the Green Infrastructure Opportunities. However, CWT are extremely concerned about the scale of development in this key GI opportunity area and feel it is contradictory to Policy DC3.

Paragraph/policy sub

2

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

A number of minor amendments proposed to Clause 4(a), (b) and (f).

Paragraph/policy sub

4

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

A number of minor amendments proposed to Clause 5(a), (b), (c) and (d).

Summary of comments

Whilst the constraints on development proposed in clause (5) are welcomed, it is important to note that some areas of green infrastructure should be primarily set aside for ecological or environmental considerations. They will contribute to vital ecosystem services for humans (for example flood control or pollination) but may not primarily contribute to considerations such as health and well-being, economic growth, sport, recreation and leisure. Other areas of green infrastructure may be crucial for quality of life but will have a lesser contribution to ecological functionality.

Paragraph/policy sub

5

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

Clause (6) should be worded as follows: ?Where loss of or harm to Green Infrastructure and/or an ecological network is considered unavoidable, development proposals must include mitigation or, as a last resort, compensation measures. Following the application of the mitigation hierarchy, these measures must secure a substantial and measurable net gain in biodiversity assessed against the latest version of the DEFRA Metric (with a minimum gain of 10%). All proposals for off-site compensatory green infrastructure must be deployed strategically and as closely as possible to the affected green infrastructure asset and following good practice guidance.?

Summary of comments

Clause (6) could be worded more clearly and more precisely linked to the mitigation hierarchy in national policy (under which compensation is a ?last resort?). The phrase ?should seek to? unnecessarily waters down the policy on net biodiversity gain.

Paragraph/policy sub

6

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

Include reference to habitats that actively sequester and store carbon.

Summary of comments

The Mersey Valley also supports habitats (namely saltmarshes, mudflats and peatlands) that actively sequester and store significant amounts of carbon long term (in the order of centuries). The value of this key green infrastructure asset in terms of its natural capital and multiple functions cannot be understated.

Paragraph/policy sub

Para 8.3.5

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Modification if applicable

The map could be retitled as "strategic green links" or revised to also include the strategic GI assets referred to in clause 3 (Walton Hall Estate, Circular Parklands etc.)

Summary of comments

The map title refers to "key GI links/opportunities" but the map itself only appears to show the ?strategic green links? listed in clause 2 of policy. This adds to the confusion about terminology referred to above.

Paragraph/policy sub

Map Page 121

Respondent Type
Group/organisation
Policy Name/Part of plan
DC3
Oral Examination
No
Summary of comments

The map title is a little confusing as it refers to GI assets but only shows those which are designated for their biodiversity importance (as opposed to other forms of green space). In addition there appears to be number of designated sites either missing or mislabelled (e.g. Mersey Estuary and Risley Moss SAC?s)

Paragraph/policy sub

Figure 13 Page 125

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

In line with the Environment Act and our previous comments the policy should be changed to make it clear (e.g., at the start of the policy) that as a minimum all TCPA development in all locations will be expected to deliver a minimum 10% measurable net gain in biodiversity (either on site or if this is not achievable as off-site compensation).

Summary of comments

Biodiversity Net Gain must not replace or undermine the mitigation hierarchy. It must only be applied once the mitigation hierarchy has been fully followed. Additionally, Biodiversity Net Gain cannot be applied to irreplaceable habitats or statutory designated sites of nature conservation. Where, in wholly exceptional circumstances, and there are no other reasonable alternatives, having followed the mitigation hierarchy, it is concluded that destructive or damaging development has to go ahead, these features must be subject to a separate bespoke compensation procedure. To effectively contribute to nature?s recovery, delivery of Biodiversity Net Gain must be additional to existing mechanisms for nature conservation and enhancement.

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

Clause (1) could be set out more succinctly and effectively to clearly state the Council?s ambitions, as follows: ?The Council will work with partners to protect, conserve and restore biodiversity, secure a substantial and measurable net gain for biodiversity of at least 10% and enhance public access to nature across the Plan area. These efforts will be guided by national planning policy, the strategic approach to the Borough?s Green Infrastructure in Policy DC3 and the Local Nature Recovery Strategy?.

Summary of comments

Clause (1) in Policy DC4 should not set out the detail of how BNG will operate as we expect this to be set out in secondary legislation and recommend this is detailed in future supplementary planning documents (SPD). It is strongly recommend new supplementary planning guidance be drafted to help implement BNG measures.

Paragraph/policy sub

1

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

The following amendments are proposed: ? Add ?g) irreplaceable, protected and priority habitats; h) ecological stepping stones and restoration areas, and; i) other areas identified in the Borough?s Local Nature Recovery Strategy? to the list of area types. ? Correctly referring to the Nature Improvement Areas and identifying them on the Policies Map. ? Revising clause (2) to specify which of the area types are shown on the Policies Map and which ones (such as the priority habitats) are not shown on the Policies Map.

Summary of comments

Clause (2) fails in our view to set out a sufficiently comprehensive description of the Borough?s ecological assets, as it fails to mention for example priority habitats or species or stepping stones and restoration areas. Natural Improvement Areas (referred to in clause 2f) should be changed to ?Nature improvement Areas?. The first part of the clause is also incorrect as the Nature Improvement Areas are not shown on the Policies Map.

Paragraph/policy sub

2

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

It may now be better to refer to national legislation ?The Conservation of Habitats and Species (Amendment) (EU Exit) Regulations 2019? rather than the EU Habitats Directive (line 2 of clause 3). Also, whilst the policy wording roughly follows national legislation it does not do so exactly. This could potentially lead to confusion in specific cases. CWT are not convinced that the policy needs to refer to the need for project specific Habitats Regulation Assessment as this is determined by legislation. It could also now refer to the simplified term ?European sites? in line with national guidance.

Summary of comments

Support for clause (3) in principle. However a number of minor amendments are proposed.

Paragraph/policy sub

3

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

The policy should paraphrase or cross refer to the national policy. References to the DEFRA metric and a biodiversity net gain must be removed from clauses (4) and (5) in line with good practice guidelines. In the last part of clauses 4 and 5 the term "mitigated" (in relation to off-site habitat creation) is being incorrectly applied. The same applies to the term ?mitigation? in clauses 7c) and 7d). Off-site habitat creation should be termed ?compensation?. This will very likely cause confusion as under the hierarchy in NPPF para. 180a) "compensation" should only be used as a last resort, behind mitigation. This point could be addressed by including a clause earlier in the policy which paraphrases or cross refers to the harm avoidance, mitigation and compensation hierarchy in national policy (NPPF Para 180a), and shortening clauses 4, 5 and 7 (and similar references in other policies) to cross refer to these requirements.

Summary of comments

CWT are concerned that clause 4 (in contrast to the NPPF - para 180b) fails to address in-combination effects from multiple developments. Biodiversity Net Gain does not apply to statutory sites or irreplaceable habitats and development affecting these important ecological features cannot therefore achieve a net gain in biodiversity. Additionally, as discussed previously, BNG can only be applied to some regionally and locally designated sites under specific circumstances.

Paragraph/policy sub

4 and 5

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Modification if applicable

In general, we recommend strengthening the policy clause and using the term ?ecological assessment?, referring specifically to Preliminary Ecological Assessments (PEA)3 and Ecological Impact Assessments (EcIA)4 as described in good practice guidance issued by the Chartered Institute of Ecology and Environmental Management (CIEEM).

Summary of comments

Clause (7) should be mandating a more robust and standardised approach to the requirement for ecological assessment, applicable to all development with the potential to impact on biodiversity. We believe mandating standardised ecological assessments to support planning applications in this policy would bring about multiple benefits. Firstly, using these standardised terms would ensure that the content of ecological reports submitted to support development are standardised, robust, defensible and undertaken to a nationally accepted standard. This means the content of all reports should in effect be structured the same and therefore lead to less confusion about the scope and content of an undefined ?ecological appraisal?. In addition to added benefits this would bring for Warrington?s biodiversity, standardised ecological reporting would also lead to a more efficient review process for matters relating to nature conservation within the Council itself, again reducing the time spent clarifying the scope and content of ecological documents supporting planning applications.

Paragraph/policy sub

7

Respondent Type
Group/organisation
Policy Name/Part of plan
DC4
Oral Examination
No
Summary of comments

This duty is now strengthened as part of the Environment Act.

Paragraph/policy sub

Para 8.4.9

Respondent Type
Group/organisation
Policy Name/Part of plan
DC5
Oral Examination
No
Modification if applicable

In relation to clause (4) of the policy CWT query why smaller developments (i.e. below the 40-dwelling threshold) would not be asked to contribute, potentially financially for off-site provision of open space.

Summary of comments

CWT supports the references to natural and semi natural greenspace in Policy DC5 and the standards for this set out in table 7.

Respondent Type
Group/organisation
Policy Name/Part of plan
DC6
Oral Examination
No
Modification if applicable

Biodiversity should be covered in its own bullet point as it can be delivered via other means such as in the design of the buildings themselves (green roofs, swift bricks, bat boxes etc.).

Summary of comments

CWT welcomes the reference to biodiversity in clause (1c). However, CWT are concerned that biodiversity is only covered here in the context of open space and landscaping.

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV1
Oral Examination
No
Modification if applicable

Clause(6) should make it clear that proposals involving landfill or land raising will be required to include a restoration and aftercare scheme, rather than that they will be permitted if such a scheme is submitted.

Summary of comments

CWT considers that clause 6 of this policy should be strengthened.

Paragraph/policy sub

6

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV2
Oral Examination
No
Summary of comments

CWT supports this policy, including its emphasis on use of sustainable drainage systems (SuDS) and ?slowing the flow?. However, CWT do not support any development in undefended areas of the floodplain. Floodplains can support protected and priority habitats and species, and also support habitats that both store and sequester significant volumes of carbon.

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV2
Oral Examination
No
Modification if applicable

This clause should be revised to clarify that the run off rate from developments on greenfield sites must be no greater than the greenfield run off rate.

Summary of comments

For new development on greenfield sites CWT do not consider that the phrase ?is at least mimicked? in clause 12a) is very clear.

Paragraph/policy sub

12 (a)

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV2
Oral Examination
No
Modification if applicable

The policy could spell out more clearly that the ?multi-functional benefits? of SuDS systems (in clause 13) include biodiversity enhancements.

Paragraph/policy sub

13

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV4
Oral Examination
No
Summary of comments

CWT is broadly content with policy ENV4 provided effective restoration and aftercare of sites is required (see comments policy ENV6).

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV5
Oral Examination
No
Modification if applicable

CWT suggest that clause (3) be phrased in the negative (?? will only be approved provided that?). It is also suggested that clause 3(c) should be changed to require landscape and visual impacts to be found acceptable rather than just to be assessed. CWT would like to see Clause (7) expanded to also cover peat extracted to facilitate the extraction of other minerals and also peat extracted to facilitate development. A source should be referenced for the peat resources displayed on Fig 16.

Summary of comments

Although the proposed policy on hydrocarbon development (set out in clause 3) broadly accords with current government policy, we have concerns about the potential impact of this form of development. CWT strongly supports the protection for the Borough?s peat resources which is provided for in clause 7 of this Policy.

Paragraph/policy sub

3 and 7

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV6
Oral Examination
No
Modification if applicable

Amend as follows: ?Applications for mineral extraction and/or landfill/land raising of waste sites must be accompanied by appropriate proposals for site restoration and aftercare.?

Summary of comments

Clause 1 could be strengthened.

Paragraph/policy sub

1

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV6
Oral Examination
No
Modification if applicable

A new clause 2(d) should be added as follows: "d) Maximise the scope for biodiversity enhancement, including the creation wherever practicable of new or improved wildlife habitats, together with effective proposals for their long-term management"

Summary of comments

CWT supports paragraphs 9.6.6. and 9.6.7 as they recognise the scope which often exists for mineral and waste sites to be restored to enhance biodiversity. However, we feel that this should be more clearly set out in the policy itself.

Paragraph/policy sub

2

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV7
Oral Examination
No
Summary of comments

CWT supports the need to decarbonise energy production in an appropriate way but is concerned about the potential impacts that some proposals for low carbon energy development can have on wildlife.

Respondent Type
Group/organisation
Policy Name/Part of plan
ENV8
Oral Examination
No
Modification if applicable

The last sentence of clause (4) should be strengthened as follows: ??Any proposals that would result in increased traffic flows on the M62 past the Manchester Mosses SAC of more than 100 vehicles per day or 20 Heavy Goods Vehicles (HGVs) per day must include a scheme specific range of measures to reduce reliance on cars, reduce trip generation and promote ultra-low emission vehicles. The scheme must be considered acceptable by the Council and be implemented in full.?

Summary of comments

CWT broadly supports this policy, including its provisions relating to air quality impacts on the Manchester Mosses Special Area of Conservation (SAC). However, it is considered that the policy could be strengthened.

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 10
Oral Examination
No
Modification if applicable

CWT consider that better outcomes could be ensured if more consistent policy wording could be developed addressing these points. It is noted that biodiversity enhancement is listed (e.g. in clause 3 of Policy MD1 and equivalent parts of MD2 to MD6) as a form of infrastructure. If this is not considered to be technically correct it could be addressed by wording changes (e.g. at the start of these clauses).

Summary of comments

CWT are concerned that not all the allocation policies specifically require approval of a Development Framework by the Council. It is unclear why some policies specify that the Development Frameworks must be prepared by the landowners. Issues such as landownership changes or different landowners having conflicting intentions could present future unknown variables across these strategic sites.

Respondent Type
Group/organisation
Policy Name/Part of plan
MD1
Sound
No
Oral Examination
No
Modification if applicable

1. CWT recommend a minimum undeveloped buffer of 15m (inside the allocation red line boundary) is secured in line with the standing advice provided by Natural England to ensure the allocation complies with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b and 180a. The allocation may also impact upon the internationally, nationally and locally designated sites downstream of the proposed development site, namely: the Mersey Estuary Special Protection Area (SPA), Ramsar and Site of Special Scientific Interest (SSSI) and the Upper Mersey Estuary LWS. 2. CWT recommend the MD1 HRA policy wording changes suggested above are incorporated to ensure this allocation will definitely be assessed through a project specific HRA. 3. CWT recommend this is incorporated into the main text of Policy MD1 in line with WLP Policy DC4 and NPPF Paragraph 180a. 6. In order to comply with the mitigation hierarchy as set out in WLP Policy DC4 and national planning policies (outlined above), measures will be required to avoid and mitigate the impacts on these important species.

Summary of comments

1. While we welcome the significant reduction in scale of this allocation, the site is in close proximity to two Local Wildlife Sites (LWS); Walton Locks LWS and Moore Nature Reserve LWS. The development of the reduced Warrington Waterfront allocation still has the potential to impact on these locally important sites for biodiversity. 2. CWT disagree that any residual risk of functionally linked habitat loss is now removed as a result of the reduced scope of the allocation, as concluded in the updated WLP Habitats Regulations Assessment (HRA). 3. Due to the proximity of the Warrington Waterfront allocation site to the proposed Fiddlers Ferry (MD3) allocation and the Warrington Western Link we believe that any ecological impacts arising as a result of any of these proposed schemes should be assessed in-combination, in line with good practice guidance from CIEEM. 4. Allocation of this site conflicts with WLP Policy DC3 and NPPF Para 175 as the site sits within the Mersey Valley Corridor, a key Green Infrastructure Opportunity Area. 5. Securing a measurable biodiversity net gain for this site, in line with WLP Policies DC3 and DC4 and NPPF Paragraphs 174d and 179b, may not be possible due to the current high value of the site and the potential requirement to deliver mitigation/compensation for the loss of functionally linked habitat of the Mersey Estuary SPA and Ramsar qualifying bird species. 6. The land at Warrington Waterfront may potentially be important for hedgehog (NERC S41 species) and the populations of breeding and wintering birds it supports including BoCC red listed birds such as skylark, song thrush and herring gull.

Respondent Type
Statutory/prescribed body
Policy Name/Part of plan
MD2
Sound
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

Allocation of this site conflicts with WLP Policy DC3 and NPPF Para 175 as some of the site sits within a WLP Green Infrastructure Opportunity Area. CWT strongly objects to the inclusion of the MD3 allocation in the WLP, and in particular Phase 2 (i.e. the southern site).

Modification if applicable

1. The site must be excluded from the allocation to comply with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b and 180a. 3. The MD2 HRA policy wording changes suggested previously should be incorporated to ensure this allocation will definitely be assessed through a project specific HRA in line with proposed local and national planning policies. 4. The need for in-combination effects should be incorporated into the main text of Policy MD6 in line with WLP Policy DC4 and NPPF Paragraph 180a.

Summary of comments

1. The site incorporates part of the Grappenhall Heys LWS. 2. The site is immediately adjacent an area of ancient woodland associated with the Dingle and Fords Rough LWS, an irreplaceable habitat as per the NPPF para 180c, which could potentially be significantly affected by loss or deterioration as a result of the proposed scheme. 3. As highlighted in the updated WLP HRA, this site has potential to be considered as functionally linked to the Mersey Estuary European designated sites as it could potentially support a significant population of lapwing (a species within the qualifying assemblage). 4.Due to the proximity of the allocation site to the proposed South East Warrington Employment Area (MD6) allocation we believe that any ecological impacts arising as a result of any of these proposed schemes should be assessed in-combination, in line with good practice guidance from CIEEM.5. Lapwing are also a BoCC red listed species in rapid decline that require highly specialised farmland habitats to successfully breed, yet their presence and the potential for them to suffer potentially nationally significant impacts has not been considered, or has been assumed to be mitigatable without any evidence to base this assumption on. These highly specialised species require highly specialised mitigation, generic habitat
creation such as tree planting or hedgerow laying will not suffice to mitigate significant residual negative effects. In practice it is highly unlikely that, as suggested in the updated WLP HRA, developers would be open to retaining any key areas of improved grassland or arable land within their developments. There is also no mention of this, or Lapwing in general, in the ?South East Warrington Urban Extension: A Deliverable Proposition? supporting document. This is unacceptable and the proposed allocation must be revised to
demonstrate, rather than assume, compliance with the NPPF, particularly in regard to protected and priority species such as Lapwing and other important environmental assets. 7. While securing a measurable biodiversity net gain for this site, in line with WLP Policies DC3 and DC4 and NPPF Paragraphs 174d and 179b, may be possible; the potential requirement to deliver mitigation/compensation for the loss of functionally linked habitat of the Mersey Estuary SPA and Ramsar qualifying bird species may make achieving a measurable BNG more difficult. 8. Other examples of potential priority habitats including semi-natural woodland, several ponds and hedgerows are also located within the allocation. The mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies (outlined above) and all these areas should be excluded from the allocation in order to avoid harm to biodiversity. 9. The land at SEWUE may potentially be important for hedgehogs, bats and badgers and the populations of breeding and wintering birds it supports including BoCC red listed birds such as curlew, lapwing, lesser redpoll, skylark and yellowhammer. Curlew are classed as globally near threatened and are possibly the UK?s most important bird conservation priority10. In order to comply with the mitigation hierarchy as set out in WLP Policy DC4 and national planning policies (outlined above), measures will be required to avoid and mitigate the impacts on these important species.

Respondent Type
Statutory/prescribed body
Policy Name/Part of plan
MD3
Sound
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

Allocation of this site conflicts with WLP Policy DC3 and NPPF Para 175 as the site sits within the Mersey Valley Corridor, a key Green Infrastructure Opportunity Area. In line with our previous comments on brownfield land, the development of the Fiddlers Ferry site will cause harm to at least two locally designated sites of importance for biodiversity (Upper Mersey Estuary Local Wildlife Site and the St Helens Canal disused LWS) and may potentially cause harm to the internationally designated sites further downstream (Mersey Estuary SPA and Ramsar). This allocation therefore conflicts with national policy which is explicit that previously developed land, treated as synonymous with brownfield, should be prioritised for development ?except where this would conflict with other policies in this Framework, including causing harm to designated sites of importance for biodiversity? (NPPF Para 119 ? footnote 47).

Modification if applicable

1. The LWS'S must be excluded from the allocation to comply with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b and 180a. 2. CWT recommend a minimum undeveloped buffer of 15m from any LWS (inside the allocation red line boundary) is secured in line with the standing advice provided by Natural England to ensure the allocation complies with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b and 180a. 4. CWT strongly recommends the proposed residential, mixed use and park hub are removed from the MD3 allocation. The southern site should only be used to deliver mitigation and enhancement for significant ecological impacts arising as a result of the development of the MD3 Phase 1 scheme and the likely ecologically significant in-combination effects of the MD1, MD2 and Warrington Western Link proposals.

Summary of comments

1. This site incorporates part of the Upper Mersey Estuary LWS and the St Helens Canal (disused) LWS. 2.The site is immediately adjacent to Widnes Warth Saltmarsh LWS and the Upper Mersey Estuary Intertidal Areas and Mudflats LWS (designated in Halton) and in close proximity to Norton Marsh and Upper Moss Side Fields LWS and Moore Nature Reserve LWS. The FFPS allocation has the potential to impact on these locally important sites for biodiversity and therefore these sites must be buffered substantially within the allocation footprint to minimise these potential residual effects. These sites, including the vast swathes of saltmarsh and mudflats in close proximity to the site are also highly likely to be functionally linked to the Mersey Estuary SPA and Ramsar. The allocation may also impact upon the internationally, and nationally designated sites downstream of the proposed development site, namely: the Mersey Estuary SPA, Ramsar and SSSI. This would therefore also contradict NPPF para. 180b as the deterioration or loss of functionally linked land would likely have a significant effect on the status of the Mersey Estuary SSSI. 3. As highlighted in the updated WLP HRA, this site (and many of the immediately adjacent habitats such as saltmarsh and mudflats) have significant potential to be considered as functionally linked to the Mersey Estuary European designated sites as they potentially support a significant population of a number of qualifying species. This is further strengthened by the findings of the recently published Natural England Commissioned Report NECR36111, which shows the site to be of moderate potential or where significant numbers of water birds are visiting. CWT recommend the MD3 HRA policy wording changes suggested previously are incorporated to ensure this allocation will definitely be assessed through a project specific HRA in line with proposed local and national planning policies (outlined above). 4.It is highly likely that the current low levels of disturbance is a key reason for high species diversity (and in particular the notable assemblages of Mersey Estuary SPA/Ramsar qualifying bird species) at the Fiddlers Ferry site. Waterbirds are known to be highly sensitive to changes in the levels of disturbance, both during construction and operation of development schemes. The current proposals within the FFPS Regeneration Vision supporting document, include plans for a new visitor centre and the use of the lagoons for leisure (this appears to include sailing based on the indicative sketches). The increase in anthropogenic disturbance as a result of these proposals is highly likely to deter the use of the southern site (i.e. the lagoons and surrounding terrestrial habitat) by any Mersey Estuary SPA or Ramsar qualifying species (and many other protected and priority species), thereby resulting in a significant residual effect at an international scale. This is unacceptable and contradicts with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b, 180a and 180b. 6. Due to the proximity of the Fiddlers Ferry allocation site to the proposed Warrington Waterfront (MD1) allocation and the Warrington Western Link we believe that any ecological impacts arising as a result of any of these proposed schemes should be assessed in-combination, in line with good practice guidance from CIEEM. CWT recommend this is incorporated into the main text of Policy MD3 in line with WLP Policy DC4 and NPPF Paragraph 180a. 8. Securing a measurable biodiversity net gain for this site, in line with WLP Policies DC3 and DC4 and NPPF Paragraphs 174d and 179b, may not be possible due to the current high value of the site and the likely
requirement to deliver mitigation/compensation for the loss of functionally linked habitat of the Mersey Estuary SPA and Ramsar qualifying bird species alongside net-gain commitments. Based on an estimate of current habitats (open mosaic habitat on previously developed land, saltmarsh and reservoirs), CWT believe the current baseline value of the Fiddlers Ferry Phase 2 site could be in the region of 1,400 BNG units. Even if the reservoirs are retained, based on a very conservative estimate of ?10,000 per BNG unit (which is unlikely to be achievable), the site could cost in the region of ?10,000,000 to offset. 9. Other examples of priority habitats including open mosaic habitat on previously developed land, open water, reedbeds, saltmarsh, unimproved neutral grassland, native hedgerows, swamp and semi-natural woodland also located within the allocation. The mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies (outlined above) and all these areas should be excluded from the allocation in order to avoid harm to biodiversity. 10. The land at Fiddlers Ferry has also been confirmed to support, or likely supports, protected and /or notable invertebrates, fish, amphibians (including great crested newt), reptiles, breeding and overwintering birds including Mersey Estuary SPA qualifying species shelduck, redshank, teal and lapwing, roosting and foraging / commuting bats, otter, water vole, badger and other mammals. In order to comply with the mitigation hierarchy as set out in WLP Policy DC4 and national planning policies (outlined above), measures will be required to avoid and mitigate the impacts on these important species.

Respondent Type
Group/organisation
Policy Name/Part of plan
MD4
Sound
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

CWT recommends the Peel Hall (MD4) allocation is unsound and objects to its inclusion in the WLP. Allocation of this site conflicts with WLP Policy DC3 and NPPF Para 175 as some of the site sits within a WLP Green Infrastructure Opportunity Area.

Summary of comments

1. This site incorporates the Radley Plantation and Pond LWS. This site must be excluded from the allocation to comply with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174a, 174d, 175, 179a, 179b and 180a. 3. Other examples of priority habitats including a traditional orchard, semi-natural woodland, neutral grassland, ponds and hedgerows are also located within the allocation. The mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies (outlined above) and all these areas should be excluded from the allocation in order to avoid harm to biodiversity. 4. The land at Peel Hall may potentially be important for hedgehog, water vole and the populations of breeding and wintering birds it supports including BoCC red listed birds such as skylark, yellow wagtail and lapwing. In order to comply with the mitigation hierarchy as set out in WLP Policy DC4 and national planning policies (outlined above), measures will be required to avoid and mitigate the impacts on these important species.

Respondent Type
Group/organisation
Policy Name/Part of plan
MD5
Sound
No
Modification if applicable

CWT recommend a minimum undeveloped buffer of 15m from the Bridgewater Canal as an important wildlife corridor (inside the allocation red line boundary) is secured in line with the standing advice provided by Natural England to ensure the allocation complies with WLP Policies DC3 and DC4 and NPPF (2021) Paragraphs 174d, 179a, 179b and 180a.

Summary of comments

1. Examples of priority habitats including semi-natural woodland, ponds and hedgerows are located within the allocation. The mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies (outlined above) and all these areas should be excluded from the allocation in order to avoid harm to biodiversity. 2. The Bridgewater Canal is located immediately adjacent the allocation. This is highly likely to support a variety of foraging and commuting protected and priority species including bats and otter. 3. The land at Thelwall Heys may potentially be important for the populations of breeding and wintering birds it supports including BoCC red listed birds such as skylark, yellowhammer and lapwing. In order to comply with the mitigation hierarchy as set out in WLP Policy DC4 and national planning policies (outlined above), measures will be required to avoid and mitigate the impacts on these important species

Respondent Type
Group/organisation
Policy Name/Part of plan
MD6
Sound
No
Modification if applicable

CWT recommend that a requirement for the in-combination effects with the SEWUE is incorporated into the main text of Policy MD6 in line with WLP Policy DC4 and NPPF Paragraph 180a.

Summary of comments

1. Examples of priority habitats including semi-natural woodland, Bradley Brook, ponds and hedgerows are located within the allocation. The mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies (outlined above) and all these areas should be excluded from the allocation in order to avoid harm to biodiversity. 2. Due to the proximity of the allocation site to the proposed South East Warrington Urban Extension (MD2) allocation we believe that any ecological impacts arising as a result of any of these proposed schemes should be assessed in-combination, in line with good practice guidance from CIEEM.

Respondent Type
Group/organisation
Policy Name/Part of plan
OS1 to OS6
Oral Examination
No
Modification if applicable

All areas of priority habitats should be excluded from the allocations in order to avoid harm to biodiversity.

Summary of comments

As per our previous specific comments on the main allocations, where any examples of priority habitats located within the allocation; the mitigation hierarchy should be applied to comply with Policy DC4 and national planning policies.

Respondent Type
Group/organisation
Policy Name/Part of plan
Chapter 11
Oral Examination
No
Modification if applicable

These could include (for example): ? No applications allowed which fail to deliver a minimum 10% net gain in biodiversity in line with Plan policies. ? To deliver a net gain of at least XX by XX in the area covered by the ecological network. Reference could also be made to any targets in the Mersey Forest Plan.

Summary of comments

More specific and effective targets should be included for Policy DC4.

Respondent Type
Group/organisation
Evidence Base

HRA

Oral Examination
No
Why you consider the Draft Local Plan is not legally compliant or is unsound or fails to comply with the duty to co-operate

CWT has significant concerns with the potential in-combination effects of the scale of development proposed in the Mersey Valley Corridor (a key green infrastructure opportunity area identified in the WLP) and South East Warrington.

Summary of comments

Warrington Waterfront (MD1), South East Warrington Urban Extension (MD2), Fiddlers Ferry (MD3), the South East Warrington Employment Area (MD6) and the Warrington Western Link (WWL) all have the potential to cause significant in-combination effects to a range of important ecological features throughout and beyond Warrington. Most notably this includes the internationally designated Mersey Estuary SPA and Ramsar site, it?s assemblages of qualifying bird species and the habitats and land that are functionally linked to the main site.